The primary park features a capability of 200 MW though Sandrini II features a capability of one hundred MW. The overall price of both initiatives weren't disclosed on the other hand, throughout design, more than two hundred workers ended up used. The assignments are predicted to see A few positions https://solarcontractorsbakersfield.blogspot.com/2024/07/how-to-trace-best-commercial-solar.html