The opening is then lined with geotextile sheeting which permits water to drain by means of but stops the void filling with soil. The crates are then positioned In the excavated hole, and afterwards the geotextile is wrapped around the whole structure. A: Utilize a mechanical compactor AKA “wacker plate”. https://vivconstruct.com